Zhanjiang Haida intersection to weilugang highway, with a total investment of 1.9 billion yuan and a total length of 24.194km, the project has three super major bridges, three major bridges with a total length of 5578m, four medium and small bridges with a total length of 164M,A total of 213 sets of bridge isolation bearings are used in the project.